A factory floor works under forklift traffic, machine vibration, spilled chemicals, thermal shock and never-ending load. Left uncoated, concrete soon dusts, cracks and turns into a source that undermines production hygiene.
Before we start we map how the plant is used — under-machine, aisle, loading and washdown zones each assessed on their own — and give every area its own system and thickness. We build a phased plan and move forward with as little production stoppage as possible.
Factory Epoxy Flooring
A System per Zone
Multilayer in busy aisles, polyurethane in hygiene-critical areas, antistatic on electronics lines — all combined within one project.
Coving for Hygiene
We run concave coving at wall-to-floor junctions, so dirt cannot collect and bacteria cannot cling in the corners.
Zone Marking
We mark walkways, forklift routes, stock areas and emergency exits straight into the floor with colour coding.
Line Keeps Running
Fast-curing systems and between-shift scheduling cut production line downtime to the minimum.
Factory Epoxy Flooring
- Thickness range
- 2 - 6 mm
- Compressive strength
- 80 - 100 N/mm²
- Forklift rating
- Heavy-duty class
- Hygiene detail
- Concave coving
- Expected service life
- 10 - 15 years
- Work plan
- Phased / between shifts
- Automotive and supplier plants
- Metalworking and machinery manufacturing
- Food and beverage production lines
- Pharmaceutical and chemical plants
- Textile and garment areas
- Electronics and precision assembly lines
- Plastics and packaging production
- Maintenance workshops and technical areas
